Excel London invests £8m on phase one upgrades

Excel London has spent 拢8m on bringing phase one of the building up to scratch with phase two over the past year.

Excel London invests £8m on phase 1 upgrades
Excel London invests 拢8m on phase 1 upgrades
As well as various technical upgrades and external works, during the past 12 months a new wayfinding and digital signage system has been installed and the Waterfront Cafes totally refurbished.

A new self-contained waterfront space being used for the London 2012 Olympics has also been fitted out, further enhancing the venue’s offering.

Excel London now boasts the same facilities and services in every one of its event spaces.

"Having spent £165m on our phase two expansion, we wanted to ensure that the whole venue had the same look and feel so that it was seamless and offered the same first-class facilities and event space throughout," said operations and phase two director Brian Cole.

"We have further plans to enhance our venue facilities because we are committed to providing a world-class venue for our clients, visitors and London, to ensure we remain a premier event destination," he added.

To leave a comment and let us know your thoughts.

Topics